None

Recent failures

Failed In Fixed In Time Taken To Fix
#886 Code changes detected

#895 Manual run by Marc

9 builds

1 week, 5 days, 23 hours, 48 minutes

  • Average time to fix a failure: 1 week, 5 days, 23 hours, 48 minutes
  • Average number of builds between fixes: 9 builds
  • The longest time taken to fix a failure is 1 week, 5 days, 23 hours, 48 minutes, from failure starting in build #886.
  • The greatest number of builds taken to fix a failure is 9, from failure starting in build #886.